Property 3 is occupied by a tenant with long-term rent arrears, but a 6-month grace period for eviction is granted despite the lease being subordinate to the mortgage. The building is severely dilapidated with rain leaks and loose floors, requiring substantial repair costs. Rebuilding is possible in this urbanization control area (existing residential land), but be aware of neighbor encroachment and flood risk.
| Date | Base Price | Yield | Change |
|---|---|---|---|
| 2026-05-13 | 253k | 54.9% | — |
| 2026-05-12 | 253k | — | First |
| Bid Deadline | 2026-06-11 (remaining28 days) |
|---|---|
| Status | Bidding |
| Prefecture | 神奈川県 |
| City | 小田原市 |
| Lat/Lng | 35.2924, 139.1741 |
| Data Updated | 2026-05-13 18:11 |
| Analysis Date | 2026-05-12 18:35 |
| Detail Fetched | 2026-05-12 18:17 |
The Three-Document Set PDF is saved on our site. You can view it even after BIT listing ends.